MANILA, Philippines — The Energy Regulatory Commission (ERC) announced that it has issued the 2025 Amended Rules Enabling the Net-Metering Program for Renewable Energy., This news data comes from:http://www.052298.com
The regulator said this development aimed to streamline the implementation of the net-metering program and make renewable energy (RE) adoption more accessible to qualified end-users.
Following a series of public consultations and careful review of stakeholders’ inputs, the ERC issued Resolution 15, Series of 2025, introducing key amendments aimed at strengthening consumer protection and simplifying processes for availing of the program.
As per the ERC, one of the key amendments permits the banking and rollover of net-metering credits toward a qualified end-user's electricity usage across current and future billing periods.
It added that in the event of a property ownership change, the credits may be transferred to the new owner, subject to conditions such as a conforme letter from the original owner.

Net-metering allows customers of distribution utilities to install an on-site Renewable Energy (RE) facility not exceeding 100 kilowatts (kW) in capacity so they can generate electricity for their own use.
ERC amends net-metering rules to expand renewable energy options
In turn, any electricity generated that is not consumed by the customer is automatically exported to the distribution utility's’s distribution system.
ERC amends net-metering rules to expand renewable energy options
- House resumes budget briefings
- Students, faculty file complaint against Universidad de Manila president
- House starts flood control probe
- House probe tackles flood control corruption: Lawmakers disclose conflicts of interest
- Cebu Pacific to launch direct flights between Cebu and Palawan
- Russian drone, missile attack kills 14, injured 48 in Kyiv
- New judge to handle Dengvaxia cases named; hearing set
- China's Xi holds talks with North Korea's Kim in Beijing
- Brawner tells troops: Stop Chinese from entering Sierra Madre at all cost
- Senate subpoenas 8 DPWH officials, contractors in flood control probe